Viejas Arena Construction Notice

The following events will be affected by construction in the area.


Walking Directions from Parking Structure 12 and 7 to the Arena

      Walking Route 1

From Parking Structure 7

  • Walk through the northeast exit
  • Continue north to the traffic signal Aztec Walk
  • Cross 55th St
  • Walk east on Aztec Walk
  • The Arena main entrance, Gate 3, will be on your left

      Walking Route 2

From Parking Structure 12, top floor

  • Walk through the southeast exit
  • Cross foot bridge
  • Continue along walkway to the Arena
  • Continue around Arena to the main entrance, Gate 3, will be on your right

    ADA Drop Off & Pick Up

Drop-offs and pick-ups can be made on the east side of 55th Street, across from the Arena, in Structure 7.

    Ride Share Drop Off & Pick Up

Drop-offs and pick-ups can be made on Hardy Avenue in front of the Calpulli Center.


Construction Map

Learn more about the about the expansion and renovation.


Construction Information

The Aztec Recreation Center (ARC) expansion and renovation will create a modern campus venue to meet the current and future recreation, fitness and wellness needs of SDSU students. The facility will incorporate program and design elements to support student engagement and a holistic, inclusive approach to recreation and wellness, such as wellness programming spaces, gender neutral locker and restroom spaces, social and study spaces, a healthy eatery, and sustainable design elements while also providing the high demand recreation and fitness facility and programming spaces. Learn more